banner

Digger Track Rollers

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Fujian

  • Validity to:

    Long-term effective

  • Last update:

    2019-01-29 12:08

  • Browse the number:

    281

Send an inquiries
Company Profile
Quanzhou Sanqi Engineering Machinery Co.Ltd
By certification [File Integrity]
Contact:

sqgcjx(Mr.)  

Email:

Telephone:

Phone:

Area:

Fujian

Address:

NO.53 Tantou ,Xia Xi Industrial Area ,He Shi Town ,Luojiang District,Quanzhou City,Fujian Province,China

Website: http://www.bestundercarriageparts.com/ http://sqgcjx.szlxdz8.com/
Product details

Production description

Digger track rollers also called digger bottom rollers and digger lower rollers are used to support the weight of crawler excavators and roll on the track link. It is also used to keep track link to prevent it from lateral slippage. When the excavator steers, mini excavator bottom roller force the track assy to skip on the ground.

They are often in mud, water and just and bear strong impact. Therefore,they are required to be sealed reliably and wear-resisitant.


Structure



Sizes



Other more detailed information of mini excavator track roller are as below excel file:

Description

shovel track rollers H45

Machine weight range

1.5t to 95.3t

Applicable pitch range

90 to 317.5

Material

ductile iron for track roller collars

50MN for track roller bodies
45# for track roller shafts

Manufacturing method

casing ,forging,heat treatment,lathing,milling,drilling,grinding,oil leakage testing,assembly,painting

Color

as per customer's requirement

Packing

Standard seaworthy wooden pallets

Delivery time

Around 30 days

Port of shipment

Xiamen

guarantee time

6 months

OEM and ODM

Acceptable

Payment term

TT 30percent as deposit,TT 70 percent balance after receipt the scan copy of bill of lading

LC at sight


Packing

9pcs per pallet,several pallets as a pile up to the weight around 3t

12pcs per pallet, several pallets as a pile up to the weight around 3t

15pcs per pallet, several pallets as a pile up to the weight around 3t

20pcs per pallet, several pallets as a pile up to the weight around 3t



Wooden case for mini track rollers


We use plastic,strong strip to fasten the pallets.


Steel quality examination

Steel quality examination ensures compliance to required standard for mechanical processing and heat treatment.



FAQ

1. What is the delivery time?

Generally speaking, the delivery time is 20days to 45days.it depend on how many items for a order. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is within 10days.

2. What is MOQ for the order?

Generally speaking, the MOQ is a full container load of 20 feet container. Under this condition, the single cost can be lowered. if customers ask for less full container load. It is also acceptable.

3. How can you control your quality?

When material come inside our factory, we need to analyze the material cost. And when front idlers and sprocket rims material are casted. We need to analyze the composition to see if the material is qualified or not. When track rollers, carrier rollers and front idlers are being assembled, we need to oil leakage testing. After several parts are heat treated, we need to check the hardness before all are done.And our inspectors will check the sizes at ramdom when parts are being machined or assembled. All of these can guarantee the parts with correct sizes and good quality.



http://www.bestundercarriageparts.com/